page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40
page 41
page 42
page 43
page 44
page 45
page 46
page 47
page 48
page 49
page 50
page 51
page 52
page 53
page 54
page 55
page 56
page 57
page 58
page 59
page 60
page 61
page 62
page 63
page 64
page 65
page 66
page 67
page 68
page 69
page 70
page 71
page 72
page 73
page 74
page 75
page 76 page 77
page 78
page 79
page 80
page 81
page 82
page 83
page 84
page 85
page 86
page 87
page 88
page 89
page 90
page 91
page 92
page 93
page 94
page 95
page 96
page 97
page 98
page 99
page 100
page 101
page 102
page 103
page 104
page 105
page 106
page 107
page 108
page 109
page 110
page 111
page 112
page 113
page 114
page 115
page 116
page 117
page 118
page 119
page 120
page 121
page 122
page 123
page 124
page 125
page 126
page 127
page 128
page 129
page 130
page 131
page 132
page 133
page 134
page 135
page 136
page 137
page 138
page 139
page 140
page 141
page 142
page 143
page 144
page 145
page 146
page 147
page 148
page 149
page 150
page 151
page 152
page 153
page 154
page 155
page 156
page 157
page 158
page 159
page 160
page 161
page 162
page 163
page 164
page 165
page 166
page 167
page 168
page 169
page 170
page 171
page 172
page 173
page 174
page 175
page 176
page 177
page 178
page 179
page 180
page 181
page 182
page 183
page 184
page 185
< prev - next > Energy Hydro power civil_works_guidelines_for_micro_hydro (Printable PDF)
74 CIVIL WORKS GUIDELINES FOR MICRO-HYDROPOWER IN NEPAL
Ystorage = Vsediment / A
Where Ystoraeis the storage depth in the settling basin below
the hydraulic depth (y) discussed earlier, and A is the plan
area. The hydraulic depth and the storage depth are also
shown in Figure 5.3.
5.3.6 COMPONENTS OF A SETTLING BASIN
The settling basin has three distinct zones; the inlet, settling
and outlet zones. These are discussed below and shown in
Figures 5.3 and 5.4.
Inlet zone
This is the initial zone where the transition from the headrace
to the settling basin occurs and there is a gradual expansion
in the basin width.
The design of the inlet is important to the efficiency of the
basin. For high hydraulic efficiency and effective use of the
basin, the inlet should distribute the inflow and suspended
sediment over the full cross sectional area of the settling zone.
Various research data show that horizontal velocity variations
across the width of a rectangular tank affect the hydraulic
efficiency considerably more than velocity variations in depth.
Therefore, attention needs to be given to uniform flow
distribution in the horizontal plane. The following methods
are used in the inlet zone to achieve a good flow distribution:
Photo 5.2 Sliding gate at settling basin entrance, Peru
Figure 5.4 Expansion and contraction ration in settling basin
Gradual expansion of the inlet channel. This is the most
commonly used method in micro-hydro schemes.To
determine the length of the inlet zone, set the horizontal
expansion ratio at about 1:5 (a = 11°) as shown in Figure
5.4. This will allow an even flow distribution at the beginning
of the settling zone. The vertical expan-sion ratio can be
higher at about 1:2 (a = 27°) as shown in Figure 5.3.
Another option is to incorporate a weir as can be seen in
the Galkot settling basin (Drawing 420/04/3C01).
Troughs with slots or orifices in walls or bottom.
Baffle walls
Note that orifices or baffle walls are often used in water
treatment facilities where extremely low velocity is required
but these methods are rarely used in micro-hydro schemes.
In some schemes in Peru, a sliding gate is installed in front of
the settling basin as shown in Photograph 5.2. During
flushing, the gate is initially closed, impounding water behind
it. When the settling basin is emptied, the gate is opened and
the sudden rush of the impounded water flushes out any
sediment that has remained inside the basin.
Settling zone
The basin reaches the required width at the beginning of this
zone. Particles are settled, stored and flushed in this zone.
The length of this zone is longer than the inlet or the outlet
zones. It should be noted that long narrow basins perform
better than short wide basins. A range of 4 to 10 is
recommended for the ratio of the length to width (L/B). Basin
shape can also be improved by subdivision with a longitudinal
divide wall, since this doubles the L/B ratio for a given basin
length. Also, the longitudinal divide wall can assist in the
operation of the scheme. For example, the sediment in one
sub-basin can be flushed while the other is in operation,
producing half the power output. Without the subdivision,
the plant would have to be closed during flushing.
Provision for flushing the stored sediment should be at the
end of the settling basin. A floor slope of 1:20 to 1:51 in the
settling zone facilitates flushing.
Outlet zone
This forms the transition from the settling zone to the
headrace. The transition can be more abrupt than the inlet